Underground Delays

Day of Week - Fri - Records

Index   Chart   First   Previous   Next   Last   Links

  Line   Date   Time   Delay   Acc Delay   Station   Cause   Area   Equip   H/E 
 #1   Central   1-Mar-96   0955   10   Shepherds Bush   signal problem   signal 
 #2   Central   8-Mar-96   1339   8   14   Gants Hill   power supply problems   power 
 #3   Central   8-Mar-96   1506   6   20   train brake defect   train   brake 
 #4   Central   8-Mar-96   1522   6   Hainault   broken train window   train   window 
 #5   Central   8-Mar-96   1618   17   defective train   train 
 #6   Central   15-Mar-96   0541   20   Leytonstone   signal failure   signal 
 #7   Central   15-Mar-96   0926   6   Hanger Lane   problem with automatic train brake system   train   atps 
 #8   Central   15-Mar-96   2200   14   Marble Arch   signal remaining at danger due to signalman's error   signal   yes 
 #9   Central   15-Mar-96   0026   10   West Ruislip   problem with automatic train brake system   train   atps 
 #10   Central   22-Mar-96   0512   32   36   Leyton   signal failure   signal 
 #11   Central   22-Mar-96   1649   6   10   Debden   defective power supply   power 
 #12   Central   22-Mar-96   1916   37   107   Leyton   signal failure   signal 
 #13   Central   29-Mar-96   1310   8   12   West Ruislip   staff error delays departure   operation   yes 
 #14   Northern   15-Mar-96   0903   13   30   Hampstead   signal stuck at danger   signal 
 #15   Northern   15-Mar-96   1515   121   London Bridge   station closure due to constractors spilling materials in bo   station 
 #16   Northern   22-Mar-96   1410   80   Tooting Bec   track failure   track 
 #17   Northern   29-Mar-96   0758   10   13   South Wimbledon   signal failure   signal 
 #18   Northern   29-Mar-96   1959   9   High Barnet   train power supply failure   power train 
 #19   Northern   29-Mar-96   2222   83   Colindale   station closure due to local power failure   power station 
 #20   Bakerloo   8-Mar-96   1017   36   Lambeth North   signal fire   signal 
 #21   Bakerloo   15-Mar-96   1245   6   Elephant & Castle   defective driver controls   train   control 
 #22   Bakerloo   15-Mar-96   1302   10   Kensal Green   train shunting   operation 
 #23   Bakerloo   22-Mar-96   1516   6   8   Kilburn Park   defective train doors   train   door 
 #24   Bakerloo   22-Mar-96   1538   10   52   Baker Street   main power supply fault   power 
 #25   Bakerloo   22-Mar-96   1725   13   16   Stonebridge Park   defective train   train 
 #26   Bakerloo   22-Mar-96   2040   6   Queens Park   driver late   driver   yes 
 #27   Jubilee   15-Mar-96   0552   6   10   Neasden   no driver/train cancelled   driver   yes 
 #28   Jubilee   22-Mar-96   1732   36   Wembley Park   track failure   track 
 #29   Jubilee   29-Mar-96   0850   15   Neasden   train doors defective   train   door 
 #30   District   1-Mar-96   1604   13   36   Richmond   points failure   track 
 #31   District   1-Mar-96   2118   15   63   signal failure on shared track   signal 
 #32   District   15-Mar-96   0026   30   Wimbledon Park   train defect   train 
 #33   District   22-Mar-96   1012   29   35   Barons Court   engineers train stalls holding up passenger services   operation 
 #34   District   29-Mar-96   0941   8   14   Westminster   track failure   track 
 #35   Metropolitan   1-Mar-96   0755   33   Aldgate   defective handbrake   train   brake 
 #36   Metropolitan   8-Mar-96   1327   11   16   Baker Street   signal problems   signal 
 #37   Metropolitan   29-Mar-96   0820   12   30   Baker Street   signal failure   signal 
 #38   Victoria   15-Mar-96   0849   43   Walsthamstowe Central   track power failure   track power 
 #39   Victoria   15-Mar-96   0939   16   21   Warren Street   defective train power   train power 
 #40   Piccadilly   8-Mar-96   1321   7   15   Holloway Road   signal failure   signal