Underground Delays

Day of Week - Tue to Line - Bakerloo - Records

Index   Chart   Nodes   Links

  Line   Date   Time   Delay   Acc Delay   Station   Cause   Area   Equip   H/E 
 #1   Bakerloo   5-Mar-96   0623   7   Elephant & Castle   due to train fault   train 
 #2   Bakerloo   12-Mar-96   0818   6   Queens Park   overrun of Railtrack engineering works   night 
 #3   Bakerloo   12-Mar-96   1140   10   Queens Park   train shunting causes congestion   operation 
 #4   Bakerloo   12-Mar-96   1557   10   17   train door problems   train   door 
 #5   Bakerloo   12-Mar-96   2219   6   Queens Park   driver fails to arrive   driver   yes 
 #6   Bakerloo   12-Mar-96   0008   17   Queens Park   problems with track points   track 
 #7   Bakerloo   12-Mar-96   0030   25   35   late running night engineering workers train   operation 
 #8   Bakerloo   19-Mar-96   0648   6   10   Queens Park   train delayed on shared North London track   operation 
 #9   Bakerloo   19-Mar-96   2038   8   Elephant & Castle   train driver cuts finger   driver   yes 
 #10   Bakerloo   26-Mar-96   1406   12   20   Harrow & Wealdstone   train power supply problems   train power 
 #11   Bakerloo   26-Mar-96   1659   10   Queens Park   problems on shared track with main line tracks   operation 
 #12   Bakerloo   26-Mar-96   2028   9   15   Queens Park   track problems on main line   operation