Underground Delays

Day of Week - Mon to Line - Central - Records

Index   Chart   Nodes   Links

  Line   Date   Time   Delay   Acc Delay   Station   Cause   Area   H/E 
 #1   Central   11-Mar-96   0500   19   36   Woodford   signal problems   signal 
 #2   Central   11-Mar-96   0514   36   Woodford   taxi bringing in staff was late   operation   yes 
 #3   Central   11-Mar-96   0724   8   12   Marble Arch   defective signal equipment on train   train signal 
 #4   Central   11-Mar-96   2309   6   Perival   defective platform safety equipment delayed train signal   station safety 
 #5   Central   11-Mar-96   2330   6   10   Mile End   signals stuck at danger   signal 
 #6   Central   11-Mar-96   0041   60   Leytonstone   track power supply failure   power track 
 #7   Central   18-Mar-96   0542   10   White City   train not ready for service   train 
 #8   Central   18-Mar-96   0558   9   West Ruislip   defective train in depot, late entering service   train 
 #9   Central   18-Mar-96   0811   10   17   Queensway   signal stuck at danger   signal 
 #10   Central   18-Mar-96   1130   11   15   Queensway   same signal stuck again   signal 
 #11   Central   18-Mar-96   1157   15   Northolt   widespread signal failure in area   signal 
 #12   Central   18-Mar-96   1740   67   Holborn   station closure due to defective safety equipment   station safety 
 #13   Central   25-Mar-96   0756   6   10   Epping   loss of train power supply   power train